Vol. XXI, No. 2, Pp. 1-101
December 2006
UDC 621.039+614.876:504.06
YU ISSN 1451-3994
....Back to Contents
|
Pages: 92 - 100
Authors: Tihomir G. APOSTOLOV, Elka I. ANASTASOVA
Abstract
After the decision of the Bulgarian Government to reconstruct it, the strategy concerning the IRT-Sofia Research Reactor is to partially dismantle the old systems and equipment. The removal of the reactor core and replacement of old equipment will not pose any significant problems. For a more efficient use of existing resources, there is a need for an engineering project which has been already prepared under the title "General Plan for the Partial Dismantling of Equipment at the IRT-Sofia as a Part of the Reconstruction into a Low Power RR".
Key words: partial dismantling, decontamination, reactor equipment, radioactive wastes
FULL PAPER IN PDF FORMAT (797 KB)
|